Residential / Katampe District

Maida Vale

Three-bedroom apartments with an attached maid’s room and bathroom at Plot 84, Katampe, Abuja. Our flagship residential development is planned as 24 homes across three blocks. Prices on request.

Architectural impression of Maida Vale in KatampeArtist’s impression
StatusUnder construction
Expected completion2027
Homes24 apartments
FurnishingUnfurnished
Three bedrooms, room to settle in

Make it your own.

Each apartment includes three bedrooms, lounge and dining areas, a kitchen, and an attached maid’s room with a bathroom. Upper-floor homes have balconies.

Offered unfurnished. Bedroom wardrobes, kitchen cabinets and water heaters are not included.

Register your residential interest
Selected room areas
RoomGround-floor flatUpper-floor flat
Master bedroom20 m²24 m²
Bedroom 217 m²21 m²
Bedroom 317 m²19 m²
Lounge23 m²23 m²
Dining area10 m²10 m²
Kitchen15 m²15 m²
Maid’s room8 m²8 m²

Approximate room areas as labelled on the architectural drawings, subject to final measurement. These figures are not total apartment floor areas.

Practical details

Facilities & services.

Parking for residents
Two allocated spaces per apartment.
Visitor parking
Four spaces reserved for guests; 52 parking spaces in total.
Power & metering
Grid electricity, a backup generator and individual metering. No solar system is included.
Security
Guards, CCTV and controlled access.
Water
Borehole supply with storage tanks.
Access
Staircase access only; the apartment blocks do not have lifts.

Shared facilities will be managed by an external facilities company.

Explore the layout

Floor plans.

Select a plan to enlarge it and explore the layout.

Ground-floor apartments architectural floor plan

Ground-floor apartments

Two apartments per block on the ground floor, shown with shared access.

Enlarge plan
Upper-floor apartments architectural floor plan

Upper-floor apartments

Typical upper-floor layout, showing balconies and the larger bedroom areas.

Enlarge plan

Plans are extracted from the supplied architectural drawings. Furniture symbols are illustrative. The furnishing specification above takes precedence over furniture symbols shown on the plans.

Expected completion is 2027; the handover date will be confirmed as construction progresses.

Looking ahead to 2027

Your next home in Katampe.

Register for construction updates and be notified when residential leasing opens.

Register your residential interest

Floor plan

100%